Detroit Diesel MBE 4000 Service Manual page 163

Hide thumbs Also See for MBE 4000:
Table of Contents

Advertisement

www.rtrucks.ru
15. Using a dial gauge and holder, measure the piston projection relative to crankcase top
dead center at all the pistons. See Figure 1-88.
1. Piston
Figure 1-88
16. If the piston projection dimensions are not between 0.244 and 0.715 mm (0.0096 and
0.0281 inch), replace the piston. Listed in Table 1-25.
Piston Projection (from TDC)
Table 1-25
17. Remove the engine cranking tool (J 46167 or 407 589 00 63 00).
Be careful not to damage the oil spray nozzles. Damaged
oil spray nozzles could result in a loss of oil pressure and
cause engine damage.
18. Install the oil spray nozzles, as removed. Be sure they are seated and aligned correctly.
Refer to section 3.1.2.
19. Install the oil pan. Refer to section 3.1.2.
20. Install each cylinder head, as removed. Refer to section 1.2.2.
All information subject to change without notice.
6SE412 0403 Copyright © 2004 DETROIT DIESEL CORPORATION
www.rtrucks.ru
www.rtrucks.ru
Piston Projection at Top Dead Center (TDC)
Description
Piston Projection Specifications
NOTICE:
www.rtrucks.ru
MBE 4000 SERVICE MANUAL
2. Cylinder Liner
mm (in.)
0.244 to 0.715 (0.0096 to 0.0281)
www.rtrucks.ru
1-115
www.rtrucks.ru

Advertisement

Table of Contents
loading

Table of Contents