Detroit Diesel MBE 4000 Service Manual page 160

Hide thumbs Also See for MBE 4000:
Table of Contents

Advertisement

1.17
PISTON, PISTON RING, AND CONNECTING ROD
www.rtrucks.ru
The half of the bearing shell installed in the connecting
rod (rod half) has a specially-treated friction surface that
allows it to bear higher loads. It cannot be interchanged
(swapped) with the other half of the bearing shell installed
in the bearing cap (cap half).
6. Install the rod half of the bearing shell in the connecting rod, as marked on removal.
See Figure 1-85.
1. Connecting Rod
2. Bearing Shells
Figure 1-85
[a] Be sure that the locking lug in the bearing shell is fully seated in the groove of the rod.
[b] Lubricate the bearing surface with a light coating of clean engine oil.
7. Lubricate the cylinder liners with a light coating of clean engine oil.
1-112
www.rtrucks.ru
NOTICE:
Installing the Bearing Shells
www.rtrucks.ru
3. Bearing Cap
6SE412 0403 Copyright © 2004 DETROIT DIESEL CORPORATION
www.rtrucks.ru
www.rtrucks.ru
All information subject to change without notice.
www.rtrucks.ru

Advertisement

Table of Contents
loading

Table of Contents