Agilent Technologies 1100 Series Reference Manual page 124

Fluorescence detector
Hide thumbs Also See for 1100 Series:
Table of Contents

Advertisement

4
Troubleshooting and Test Functions
Procedure using the Control Module
1 Load the FLD default parameter
2 Enter System - Tests - FLD.
3 Select the function Enable test chromatogram and press Execute.
4 Enter the Plot function and select Signal A and/or Analog x, set a time
If an Agilent ChemStation is connected, the next step will start the Agilent ChemStation
NO TE
simultaneously and will overwrite the previous used Data File!
5 Start the run.
After the run has finished, the plot can be printed to a connected printer by
pressing the m-key and selecting Print Plot.
The test chromatogram is switched off automatically at the end of the run.
NO TE
126
peakwidth to >0.2 minutes (standard),
set stop time to 4.8 minutes.
The logbook shows "Simulated chromatogram enabled".
range of 10 minutes and the FLD signal from -1 to 50 LU.
1100 Series FD Reference Manual

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents