Pump Solenoid Valve Check . B - Nordson 3100V Series Customer Product Manual

Hot melt material applicator with 6:1 sp30 piston pump and vista'controller
Hide thumbs Also See for 3100V Series:
Table of Contents

Advertisement

B
1-8
Hydraulics
Pump Solenoid Valve Check
1.
Reduce
the pump air pressure to
0.
2.
Remove
the pump cover.
3.
Disconnect the
air input line from the actuator.
4.
Make sure
the READY light is lit and the pump
is
turned
on.
5.
Slowly increase pump air pressure.
6.
Check
the disconnected air input line for air flow.
WARNING:
Risk of
electrical
shock.
Failure
to observe
electrical safety procedures may result in personal injury or
death. Allow
only
qualified personnelto perform the following
procedures. Obserue all high voltage indicators.
7.
Open
the electrical enclosure. Refer to Opening the Electrical
Enclosurein
Control.
B.
Locate
connector J9 on the power board and measure the voltage at
positions 1
and2.
Condition
Action
Airflows.
The solenoid valve
is
functioning properly. Reduce
the pump air pressure to 0, reconnect the air input
line,
and return to Table B
1-1.
Air
does not
flow.
Go to
the next step
Voltage
Action
22.8-25.2VDC
Replace
the solenoid
valve.
Refer
to Pump
Solenoid Valve Repair Procedures.
Less than
22.8VDC
Replace
the power board. Refer to Replacing the
Power
Boardin
Control.
81
EN-02-[3V-X-AGXX]-2
41-3000y
lssued 5/00
@000
Nordson Corporalion
All
rights reserved

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

3400v series3500v series3700v series

Table of Contents