Nordson 3100V Series Customer Product Manual page 86

Hot melt material applicator with 6:1 sp30 piston pump and vista'controller
Hide thumbs Also See for 3100V Series:
Table of Contents

Advertisement

lnstallation
A
3-11
3.
Decide where
to
install the
first
hose by referring to
the
following
table.
Choose
the
instructions that apply to the
type of
manifold
on
your
unit.
'
CAUTION:
Failure
to
connect the
first
hose
as
instructed
creates a dead area where
char
builds up,
causing
downtime.
WARNING:
Hose ports that
are
unused
must
be closed
with a
plug.
Removing plugs can
cause
hot adhesive
to
spray or
flow
from
the
port and injure operators.
4.
Route
the
hose from
the gun
back to
the
unit.
Make sure
the
hose
does
not
contact
sharp or abrasive
surfaces.
Follow
the
hose-routing
guidelines
shown
in Figure A3-7.
Type
of Manifold
lnstructions
Four-port manifold
Six-port
manifold
Use hose port
number
1.
Use hose port
number
1
or
2.
ll
you
plan
to
install
six
hoses
(either now or in the
future),
use
hose port
number
1
for the
first
hose
(see Note
A).
lf
you
plan
to
install less
than six
hoses, you
can
use hose
port
number
2
for
the
first
hose.
NOTE
A:
To
install six hoses,
your
unit must have
the
ability
to
heat
six hoses.
Check
to see
if
your
unit has
six
hose electrical
receptacles.
Units
can
be ordered with
two,
four, or
six
receptacles.
I
a
e000
Nordson
Corporation
All
rights
reseled
41-3000y
lssued
5/00
A3
EN-04-[3V-X-4XXVj-1
3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

3400v series3500v series3700v series

Table of Contents