Location Requirements - Nordson 3100V Series Customer Product Manual

Hot melt material applicator with 6:1 sp30 piston pump and vista'controller
Hide thumbs Also See for 3100V Series:
Table of Contents

Advertisement

A3-2
lnstallation
Location
Requirements
Carefully select the location for the unit and its associated guns and
hoses.
Make sure that
the location meets the following requirements:
a
There is enough room to open the tank lid, open the electrical
enclosure, remove the filter assembly, remove the pump enclosure,
and make
electrical connections for the
hoses.
For unit
dimensions
and
recommended clearances, refer
to
Dimensions
in lhe Description
section of
this manual.
a
a
An
operator can reach all controls.
Maintenance
personnel have room to service and repair the unit.
lnstallers can route the hoses without bending
them. The
minimum
bend radius
for hoses
is
shown in Figure A
3-7.
The mounting surface can support the weight
of
the unit when the unit
is
filled with
adhesive.
Refer
lo
Specificatlons in
lhe Description
section
of
this manual.
The mounting surface is level.
The mounting surface is raised at least 152 mm (6 in.) for draining
adhesive. See
Figure A 3-1.
The drain valve projects over the edge of the mounting surface.
152 mm
(6.0
in.)
413068sA
Fig. A
3-1
Required Clearance
for
Draining
and
Filter Flushing
a
a
a
a
ASEN-04-[3V-X-4XXV]-1
3
41-3000v
lssued
5/00
@
2000 Nordson Corporation
All
rights reserved

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

3400v series3500v series3700v series

Table of Contents

Save PDF