Nordson 3100V Series Customer Product Manual page 294

Hot melt material applicator with 6:1 sp30 piston pump and vista'controller
Hide thumbs Also See for 3100V Series:
Table of Contents

Advertisement

Tank
B
3-7
Restoring the Unit to Normal
Operation
B.
Apply
thermal compound to
the
RTD and thermostat
and install them
on
the side
of
the tank.
9.
Reconnect
the ground wire (if present) to the tank.
10.
lf
the unit was attached to
a
support platform, anchor
it
to
the platform
now.
11. Lay the
tank strainer
in
the bottom
of
the tank.
12. lnstall a new
tank gasket and secure the tank cover to the tank.
NOTE:
You
should replace the tank gasket any time the tank cover
is.
separated
from the tank.
13.
Swing the
wire harness and hose-end panel into position and secure
the hose-end panel with the screws you removed earlier.
14.
Make sure
the air-line adapter is securely inserted
in
the recessed
area
on
the inside
of
the hose-end
panel.
Secure
the adapter with
the screws
you removed earlier.
15. lnstall
the pump air pressure regulator and connect the incoming air
line to
the regulator.
16. lnstall the
tank lid assembly using the screws you removed earlier.
17.
lnstallthe
unit's
front and back panels.
Follow
this procedure to reinstall the pump and restore the unit to normal
operation.
1
.
lnstall
the
pump.
Refer
to
Pump
lnstallation in lhe Hydraufbs section,
2.
lnstall and secure
the pump cover.
3.
Return
the pump air pressure to the normal operating setting.
4.
Remove
the lock-out and restore power to the unit.
@000
Nordson
Corporation
All
dghts reserved
41-3000y
lssued
5/00
BsEN-05-[3V-4-AXX]0-2