Nordson 3100V Series Customer Product Manual page 293

Hot melt material applicator with 6:1 sp30 piston pump and vista'controller
Hide thumbs Also See for 3100V Series:
Table of Contents

Advertisement

B
3-6
Tank
Reassembling the
Tank
and
Manifold
@ontd;
4.
lnsert the manifold washers and screws
in
the bottom of the manifold
and tighten
them finger tight only. Then tighten the screws
in
the
sequence
shown in Figure B
3-5.
Tighten
the screws to
5.4-6.8 N.m (4-5
ft-lb).
Fig.
B
3-5
Correct
Sequence for
Tightening
Manifold
Screws
5.
Turn the
tank and manifold over so that the tank's open side is up and
wrap the insulation around the tank and manifold. Use
high-temperature duct tape to secure the insulation.
6.
Reconnect
the heater wires to the tank heater connections.
7.
Hold the
spacers in place and attach the tank and manifold to the
base
of
the unit with the screws and washers removed earlier. lt may
be necessary to tilt the unit to gain access to the bottom
of
the base.
Tighten
the screws to 10.9-13.6 N.m (8-10 ft-lb).
NOTE:
Be sure
you do not pinch the heater wires when you are
securing the
tank and manifold to the base.
NOTE:
To
ease assembly, you can cut the heads off
of
four M8
screws
that are longer than the spacers (do not use the screws
supplied with the service
kit).
Loosely
thread the cut screws into the
tapped holes in the bottom
of
the manifold. Slip the spacers over the
screws. This will
keep
the spacers in line until you are ready to install
the supplied screws. When you are ready to install the supplied
screws, remove the cut screws. Ask an assistant to help you tilt the
unit and
support
it
while
you replace the screws and washers.
o
o
o
o
o4
oc
o1
a2
o5
41306044
83EN-05-[3V-4-AXXXI-2
41-3000y
lssued
5/00
@
2000
Nordson
Corporalion
All
rights reserved

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

3400v series3500v series3700v series

Table of Contents

Save PDF