Operation
A 4-13
7.
Check
the Material Safety Data Sheet (MSDS) for the recommended
operating
temperature
of
the new adhesive. lf the temperature
is
different from
the old adhesive, reprogram your unit's temperature
settings.
Refer to Table A 4-6.
Table A
4-6
Temperature
Programming Procedures
The unit is ready for routine operation. Refer to Operating Proceduresin
this section.
Type of Temperature Setting
Programming Procedure
Overtemperatu
re
setpoint
Refer
to
Programming
SYSTEM
SEF/NGS
Controlsinthe
lnstallation
section
of
this manual.
SETPOINT or STANDBY
temperature setpoint
Refer
to Programming
T
E
M
P
E
R
AT
U
R
E
Co
ntro
I
s
in lhe
lnstallation
section of this manual
@000
Nordson
Corporalion
All riqhls reseNed
41-3000v
lssued
5/00
A4EN-06-[3V-A-AAXVI-1