Wiring Requirements; Hose/Gun Power Requirements A - Nordson 3100V Series Customer Product Manual

Hot melt material applicator with 6:1 sp30 piston pump and vista'controller
Hide thumbs Also See for 3100V Series:
Table of Contents

Advertisement

lnstallation
A 3-3
Wiring Requirements
Hose/Gun Power Requi rements
Follow
these guidelines when installing wiring to the unit:
Allow
enough room
to
route
your electrical service line to the unit.
You
can use either
of
the
two access holes
in
the base
of
the unit for
electrical
seruice.
One hole
is
for rear access and the other
is
for
bottom access.
Route any
wires away from AC power lines, solenoid output lines,
and
electrical equipment such as motors, contacts, and relays.
Make connections with
the minimum length of wire
needed. A
long
wire can act as an antenna for electrical noise.
a
The power requirements of your hoses and guns must be determined to
make sure that you
do not overload the
unit.
lf
your Nordson
representative
has not already checked to see that your unit can support
all of
the hoses and guns you plan to install, you need to calculate your
hose/gun power
requirements
now.
You
also need to check your
calculations
if
you change your system
configuration or add new hoses
and guns.
To
determine your hose/gun power requirements, refer
lo
Calculating
Hose/Gun Capacity
al the end
of
this
manual.
lf
you need help with this
procedu re,
contact
you
r
Nordson representative.
@
2000 Nordson Corporation
All
rights reserved
41-3000v
lssued
5/00
A3
EN-04-[3V-X-4XXVj-1 3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

3400v series3500v series3700v series

Table of Contents

Save PDF