Nordson 3100V Series Customer Product Manual page 277

Hot melt material applicator with 6:1 sp30 piston pump and vista'controller
Hide thumbs Also See for 3100V Series:
Table of Contents

Advertisement

B
2-44
Control
RTD
or Thermostat lnstallation
1.
Apply
a
thermal compound to the new
FITD
or thermostat.
2.
lnstall
the RTD or
thermostat.
Refer to the
following table.
3.
Route
the
RTD or
thermostat wires along the tank harness to prevent
the wires
from being pinched and secure the wires to the harness
with
new cable ties.
4.
Connect
the
RTD or
thermostat plug.
5.
Fold
the insulation cut-away back into place.
6.
Reinstall the
front cover.
7.
Close and secure
the electrical
enclosure.
Refer
to
Opening
and
Closing the Electrical Enclosure.
To
lnstallthe
RTD
To
lnstall the Thermostat
a.
lnsert
the
RTD into
the slot on
the
tank wall.
b.
Place
the
RTD retainer plate
over
the
RTD and
secure
it
with
the
two screws removed earlier.
a.
Position
the new thermostat
on
the tank wall.
b.
Secure the
thermostat to the
tank
wall with the two screws
removed earlier.
82EN-04-[3V-X-4XXVJ-5
41-3000v
lssued
5/00
@000
Nordson Corporation
All
rights reserved

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

3400v series3500v series3700v series

Table of Contents