Toyota Celica 2000 Repair Manual page 511

Hide thumbs Also See for Celica 2000:
Table of Contents

Advertisement

AX-8
·-
AXLE (U341 EJ
Install the control shift lever with the nut
(d)
Torque: 1 3 N·m (130 kgf·cm, 9 1t·lbl)
Connect the shift control cable to the control shaft
{e)
Torque: 1 2 N·m (120 kgf·cm, 9 ft·lbl)
5.
CONNECT PARK/NEUTRAL POSITION SWITCH CON-
NECTOR
CHECK PARK/NEUTRAL POSITION OPERATION
6.
Check that the engine can be started with the shift lever only in
the N or
position, but not in other position.
P
If the engine can not be stated not as started above, carry out
the adjustment procedure (See page Dl-220).
7.
INSTALL AIR CLEANER ASSEMBLY
8.
TEST DRIVE VEHICLE

Advertisement

Table of Contents
loading

Table of Contents