270.
2
N
-
BODY
ElECTRICAl
COMBINATION METER
17.
INSPECT LIGHT CONTROL RHEOSTAT OPERATION
Gradually, turn the rheostat knob from the bright side to dark
side and check that the resistance decreases from 1 0 k.Q to 0
Q
between terminal 2 and 1 . (Rheostat knob turned to clock
wi se )
If operation is not as specified, replace the rheostat light control.
ll'
706
BE-51