Toyota Celica 2000 Repair Manual page 718

Hide thumbs Also See for Celica 2000:
Table of Contents

Advertisement

-
STEE R ING
POWER STEERING VANE PUMP
INSTALL SPRING, FLOW CONTROL VALVE AND
9.
PRESSURE PORT UNION
(a)
Install the spring.
(b)
Install the ffow control
(See page SR-22).
(c)
0-ring with power steering fluid, and install
Coat a new
it to the pressure port
(d)
Install the pressure port u
Torque:
N·m (700 kgf.cm, 51
69
INSTALL SUCTION PORT UNION
10.
(a)
Coat a new Q--.r i ng with power
it to the suction port union.
Install the suction port union with the
(b)
Torque:
12
PS
N.m
(See page S fl.-25)
MEASURE
VANE PUMP ROTATING TORQUE
11.
valve facing in the correct direction
union.
.
n
n
io
H·lbf)
steering fluid, and install
bolt.
{120
kgf.cm, 9 ft.
fbi)
SR-31

Advertisement

Table of Contents
loading

Table of Contents