Gestetner A294 Service Manual page 201

Table of Contents

Advertisement

LCT INSTALLATION (B303)
B303I020.WMF
[D]
B303I005.WMF
3. Remove the three small covers [A] from the upper right side cover.
NOTE: Small cover [I] can be removed at this time, to facilitate software
upgrade using a flash card.
4. Remove the three small covers [B] from the lower right side cover.
5. Install the four joint pins [C] on the right side of the copier. The pins with slots in
them should be used for the upper right side cover.
6. Remove the two screws that secure the grounding plate [D]. Turn the plate 180
degrees (so that left becomes right, and vice-versa) and secure it with the two
screws.
7. Remove the screw [E], which secures the locking lever [F]. Slide the locking
lever toward you (about 1/2 inch).
8. Connect the four connectors [G] and secure the grounding wire [H] (1 screw).
9. Align the LCT on the joint pins, and lock it in place with the locking lever.
10. Insert the leveling shoes under the leveling feet and level the LCT.
SM
CÓPIA NÃO CONTROLADA
[A]
[B]
[F]
[E]
3-19
CÓPIA NÃO CONTROLADA
B303I021.WMF
[I]
[H]
[C]
[G]
B303I006.WMF
A294/A295

Advertisement

Table of Contents

Troubleshooting

loading

This manual is also suitable for:

A295

Table of Contents