Ac Power Circuit Breaker Requirements For The Srx5800 Services Gateway; Srx5800 Services Gateway Standard-Capacity Dc Power Supply - Juniper SRX5800 Hardware Manual

Services gateway
Hide thumbs Also See for SRX5800:
Table of Contents

Advertisement

WARNING:
services gateway only and not for any other use.
WARNING:
to ensure proper operation, you must properly ground the services gateway chassis
before connecting power. See
for instructions.
CAUTION:
components or drape where people could trip on them.
NOTE:
In North America, AC power cords must not exceed 4.5 m (approximately 14.75 ft) in
length, to comply with National Electrical Code (NEC) Sections 400-8 (NFPA 75, 5-2.2) and
210-52, and Canadian Electrical Code (CEC) Section 4-010(3). The cords listed in
Table 19 on page 56

AC Power Circuit Breaker Requirements for the SRX5800 Services Gateway

Each AC power supply has a single AC appliance inlet located in the chassis directly above the power
supply that requires a dedicated AC power feed. We recommend that you use a dedicated customer site
circuit breaker rated for 15 A (250 VAC) minimum for each AC power supply, or as required by local code.

SRX5800 Services Gateway Standard-Capacity DC Power Supply

In the DC power configuration, the services gateway contains either two or four DC power supplies (see
Figure 19 on page
58), located at the lower rear of the chassis in slots PEM0 through PEM3 (left to right).
You can upgrade your DC power system from two to four power supplies.
Four power supplies provide full redundancy. If a DC power supply fails, its redundant power supply takes
over without interruption.
The AC power cord for the services gateway is intended for use with the
To meet safety and electromagnetic interference (EMI) requirements and
"Grounding the SRX5800 Services Gateway" on page 239
Power cords and cables must not block access to services gateway
are in compliance.
57

Advertisement

Table of Contents
loading

Table of Contents