Powering Off The Srx5800 Services Gateway; Performing The Initial Software Configuration For The Srx5800 - Juniper SRX5800 Hardware Manual

Services gateway
Hide thumbs Also See for SRX5800:
Table of Contents

Advertisement

Powering Off the SRX5800 Services Gateway

NOTE:
After powering off a power supply, wait at least 60 seconds before turning it back on.
To power off the services gateway:
1. On the external management device connected to the Routing Engine, issue the request system halt
operational mode command. The command shuts down the Routing Engine cleanly, so its state
information is preserved.
user@host> request system halt
2. Wait until a message appears on the console confirming that the operating system has halted.
For more information about the command, see Junos OS System Basics and Services Command Reference
at www.juniper.net/documentation/.
3. Attach an ESD grounding strap to your bare wrist, and connect the strap to one of the ESD points on
the chassis.
4. Switch off the power supplies:
For an AC-powered services gateway, move the AC input switch on the chassis above each AC power
supply to the off (O) position. If the services gateway is equipped with high-capacity AC power
supplies, you must also move the AC input switch on each power supply to the off (O) position.
For a DC-powered services gateway, move the DC circuit breaker on each DC power supply faceplate
to the off (O) position.
Performing the Initial Software Configuration for the
SRX5800
IN THIS SECTION
SRX5800 Services Gateway Software Configuration Overview | 250
Initially Configuring the SRX5800 Services Gateway | 250
Performing Initial Software Configuration Using J-Web | 256
249

Advertisement

Table of Contents
loading

Table of Contents