Site Preparation Checklist for the SRX5800 Services
Gateway
The checklist in
Table 35 on page 163
services gateway installation.
Table 35: Site Preparation Checklist
Item or Task
Verify that environmental factors such as
temperature and humidity do not exceed
services gateway tolerances.
Plan rack or cabinet location, including
required space clearances.
Select the type of rack or cabinet.
If a rack is used, secure rack to floor and
building structure.
Acquire cables and connectors.
Locate sites for connection of system
grounding.
Measure distance between external power
sources and services gateway installation
site.
Calculate the optical power budget and
optical power margin.
summarizes the tasks you need to perform when preparing a site for
For More Information ...
"SRX5800 Services Gateway Environmental
Specifications" on page 164
"Clearance Requirements for SRX5800 Services
Gateway Airflow and Hardware Maintenance" on
page 166
"SRX5800 Services Gateway Cabinet Size and
Clearance Requirements" on page
"SRX5800 Services Gateway Rack Size and
Strength Requirements" on page 168
"Connection to Building Structure for the
SRX5800 Services Gateway Rack" on page 169
DC Power Electrical Safety Guidelines and Warnings
"Calculating Power Budget for Fiber-Optic Cable
for the SRX5800 Services Gateway" on
page 200,"Calculating Power Margin for Fiber-Optic
Cable for the SRX5800 Services Gateway" on
page 200
Performed
By
170,
163
Date