Reinstalling The Cable Manager After Installing The Srx5800 Services Gateway Chassis - Juniper SRX5800 Hardware Manual

Services gateway
Hide thumbs Also See for SRX5800:
Table of Contents

Advertisement

231
Figure 97: Installing an IOC

Reinstalling the Cable Manager After Installing the SRX5800 Services Gateway Chassis

To reinstall the cable manager (see
Figure 98 on page
232):
1. Attach an ESD grounding strap to your bare wrist, and connect the strap to one of the ESD points on
the chassis.
2. Position the cable manager on the studs on the lower front of the chassis.
3. Insert the nuts on the corners in the cable manager onto the studs on the chassis.
4. Using a 7/16-in. nut driver, tighten the nuts securely.

Advertisement

Table of Contents
loading

Table of Contents