231
Figure 97: Installing an IOC
Reinstalling the Cable Manager After Installing the SRX5800 Services Gateway Chassis
To reinstall the cable manager (see
Figure 98 on page
232):
1. Attach an ESD grounding strap to your bare wrist, and connect the strap to one of the ESD points on
the chassis.
2. Position the cable manager on the studs on the lower front of the chassis.
3. Insert the nuts on the corners in the cable manager onto the studs on the chassis.
4. Using a 7/16-in. nut driver, tighten the nuts securely.