MATERIAL
Ethylene glycol base coolant
(Anti-freeze/Anti-corrosion coolant)
INSTALLATION
1) Install new pump gasket (1) to cylinder block.
2) Install water pump (1) to cylinder block.
Tightening Torque
(a): 11 N
3) After installing water pump, install rubber seal (2) between wa-
ter pump and oil pump.
4) Install belt tensioner, timing belt and timing belt outside cover
refer to TIMING BELT AND TENSIONER of SECTION 6A1.
5) Install generator adjusting arm (1).
6) With engine oil applied to O-ring, install oil level gauge guide
(2).
7) Adjust water pump belt tension. (Refer to WATER PUMP BELT
TENSION of MAINTENANCE in this section.)
8) Fill cooling system.
9) Connect negative cable at battery.
10) After installation, check each part for leakage.
REQUIRED SERVICE MATERIAL
Engine cooling system for improving cooling efficiency and
for protection against rusting.
.
m (1.1 kg-m, 8.0 lb-ft)
USE
ENGINE COOLING 6B-13