Suzuki WagonR+ RB310 Service Manual page 2842

Table of Contents

Advertisement

CAUTION:
D Automatic transmission consists of highly precise parts. As even a flaw in a small part may cause
oil leakage or decrease in function, check each part carefully before installation.
D Clean all parts with compressed air. Never use wiping cloths or rags.
D Before assembling new clutch discs and brake band, soak them in automatic transmission fluid for
at least 2 hours.
D Be sure to use new gaskets and O-rings.
D Lubricate O-rings with automatic transmission fluid.
D Apply automatic transmission fluid on sliding or rotating surfaces of the parts before assembly.
D Use yellow petrolatum grease or Suzuki Super Grease C to retain parts in place.
D Be sure to install thrust bearings and races in correct direction and position.
D Make sure that snap ring ends are not aligned with one of cutouts and are installed in groove correctly.
D Do not use adhesive cements on gaskets and similar parts.
D Be sure to torque each bolt and nut to specification.
1. Snap ring
7. Flat end rod or the like
UNIT ASSEMBLY
1) Install new O-rings (inside (5) and outside (6)) to reverse brake
piston (4), and apply grease to them.
"A" Grease: 99000-25030
2) Install reverse brake piston (4), wave spring (3) and reverse
brake piston seat (2) to transmission case.
3) Install new snap ring (1) by compressing wave spring thru re-
verse brake piston seat with hydraulic press (8) and special tool.
NOTE:
Don't compress wave spring more than necessary or it may
get damaged.
Special Tool
(A): 09926-96040
AUTOMATIC TRANSMISSION (4 A / T) 7B-111

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Wagonr+ rb4130Wagonr+ rb413

Table of Contents