Suzuki WagonR+ RB310 Service Manual page 2790

Table of Contents

Advertisement

1. Resister terminal for shift solenoid No.3 Circuit
2. Resister terminal for shift solenoid No.4 Circuit
3. Resister terminal for shift solenoid No.5 Circuit
DROPPING RESISTER
REMOVAL/INSTALLATION
Refer to left figure for removal/installation.
Tightening Torque
.
(a): 20 N
m (2.0 kg-m, 14.5 lb-ft)
INSPECTION
Measure resistance between each resister terminals.
CIRCUIT
Shift solenoid No.3
Shift solenoid No.4
Shift solenoid No.5
AUTOMATIC TRANSMISSION (4 A / T) 7B-59
RESISTANCE
7.5 Ω
7.5 Ω
7.5 Ω

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Wagonr+ rb4130Wagonr+ rb413

Table of Contents