2.7 Replacing the shock tower
11. Sand the internal lower weld points connecting the
shock tower and the front cross-member.
Caution!
Check carefully to ensure that there is no
evident buckling in the floorpan and in the
reinforcements connected to the centre tunnel.
12. Sand the external lateral weld points connecting the
shock tower and the front firewall.
Copyright ©
2010
11
12