Ferrari 458 Italia Technical Documentation Manual page 570

Hide thumbs Also See for 458 Italia:
Table of Contents

Advertisement

Refitting the complete engine
The engine-gearbox assembly must be lifted and
positioned in its relevant seat on the rear
subframe: this operation requires the use of a
mobile hydraulic hoist or a bridge crane with a
minimum load capacity of 300 Kg, element 31 of
the hoisting hook
(AV
for the Enzo) and the crossbeam
Connect the hook
(AV
3432) to the hoist hook of the
bridge crane, aligning so that the crossbeam
(AV
3979) faces towards the rear of the
subframe.
Connect the fixed length bars (17) to the hook
(AV
3432) and connect the variable length tie-
rods (18) to the crossbeam
Position the hoist over the engine-gearbox
assembly and connect the bars (17) to the
eyebolts (elements 27) of the hook
Connect the tie-rods (18) to the pins
Raise the hook to place the bars and tie-rods under
tension.
FROM Ass.ly No. 92290
The engine-gearbox assembly must be lifted from
the rear subframe: this operation requires the
use of a mobile hydraulic hoist or a bridge crane
with a minimum load capacity of 300 Kg,
element 31 of the hoisting hook
(which is also used for the Enzo) and the
crossbeam
(AV
3979).
Connect the hook
(AV
3432) to the hoist hook of the
bridge crane, aligning so that the crossbeam
(AV
3979) faces towards the rear of the
subframe.
Connect the fixed length bars (17) to the hook
(AV
3432) and connect the variable length tie-
rods (18) to the crossbeam
Position the hoist over the engine-gearbox
assembly and connect the bars (17) to the
eyebolts (elements 27) of the hook
Hook the tie rods (18) onto the eyebolts (19).
Raise the hook to place the bars and tie-rods under
tension.
Page 20 of 30
3432) (which is also used
(AV
3979).
(AV
3979).
(AV
3432).
(AV
8253).
(AV
3432)
(AV
3979).
(AV
3432).

Advertisement

Table of Contents
loading

Table of Contents