Starting Time Chart - Mitsubishi Electric QD77MS User Manual

Hide thumbs Also See for QD77MS:
Table of Contents

Advertisement

POINT
The BUSY signal turns ON even when position control of movement amount 0 is
executed. However, since the ON time is short, the ON status may not be
detected in the sequence program.
(The ON status of the start complete signal, positioning complete signal and M
code ON signal can be detected in the sequence program.)

Starting time chart

The time chart for starting each control is shown below.
(1) Time chart for starting "machine OPR"
[QD77MS4 operation example]
Positioning start signal
All axis servo ON
Md. 26
Axis operation status
PLC READY signal
READY signal
Start complete signal
BUSY signal
Error detection signal
Cd. 3 Positioning start No.
OPR request flag
( Md. 31 Status: b3)
OPR complete flag
( Md. 31 Status: b4)
Chapter 6 Sequence Program Used for Positioning Control
V
[Y10]
OFF
ON
[Y1]
OFF
Servo OFF
ON
[Y0]
OFF
ON
[X0]
OFF
[X10]
OFF
[XC]
OFF
[X8]
OFF
OFF
OFF
Fig. 6.4 Time chart for starting "machine OPR"
6 - 59
Near-point dog
Zero signal
ON
Standby
ON
ON
9001
ON
(Note): Refer to Section 3.3 for input/output signal of QD77MS16.
t
ON

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents