Twisting; Disposal; Wiring Process Of Sscnet Iii Cable - Mitsubishi Electric QD77MS User Manual

Hide thumbs Also See for QD77MS:
Table of Contents

Advertisement

Top of panel or wiring duct
QD77MS
5mm (0.20inch)
or more
(Note-2)
(Note-1): For wiring duct with 50mm (1.97inch) or less height. For other cases, 40mm (1.58inch) or more.
(Note-2): 20mm (0.79inch) or more when the adjacent module is not removed and the extension cable is connected.
Chapter 4 Installation, Wiring and Maintenance of the Product

(4) Twisting

If the SSCNET
condition as when local lateral pressure or bend is added. Consequently,
transmission loss increases, and the breakage of SSCNET
occur at worst.

(5) Disposal

When incinerating optical cable (cord) used for SSCNET
hydrogen fluoride gas or hydrogen chloride gas which is corrosive and
harmful may be generated. For disposal of SSCNET
specialized industrial waste disposal services that have incineration facility
for disposing hydrogen fluoride gas or hydrogen chloride gas.
(6) Wiring process of SSCNET
Put the SSCNET
the Simple Motion module with bundle material in order to prevent
SSCNET
cable from putting its own weight on SSCNET
Leave the following space for wiring.
• Putting in the duct
cable is twisted, it will become the same stress added
cable
cable in the duct or fix the cable at the closest part to
Base unit
30mm
(1.18inch)
or more
(Note-1)
Panel
70mm
(2.76inch)
or more
5mm (0.20inch)
or more
4 - 16
cable may
cable,
cable, request for
connector.
80mm
(3.15inch)
or more
98mm
(3.86inch)
Door

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents