Siemens SIMATIC BATCH Operating Manual page 599

Process control system pcs 7
Table of Contents

Advertisement

Icon
Toolbar with operator functions
A toolbar is also shown in the OS control, depending on the configured control property. The
potential functions are the same as those available in the shortcut menu.
Operation of the control in process mode
This description is based on the following requirements:
● The "SIMATIC BATCH OS Master" control has been inserted in a process picture and
appropriately configured.
● WinCC Runtime has been started and the process picture with this control is displayed.
● SIMATIC BATCH has been started on the PC from which the BATCH project originates.
This is how you connect the master control with a SIMATIC BATCH project:
1. Update your project data with the function provided for this in the toolbar.
2. Select the project you want to work with and monitor from the list of BATCH projects.
3. Select the "Connect project" command in the shortcut menu.
Once the connection to the BATCH project has been successfully established, the "Project is
activated" symbol is shown in the control on the corresponding project line.
SIMATIC BATCH V8.2
Operating Manual, 02/2016, A5E35958174-AA
Function
Meaning
Change
If you click on the "Change" command with your left mouse button,
you will open a drop-down list with additional commands.
Use the listed commands to change to the respective OS control. If
you have activated the command "Undock automatically" in the tar‐
get OS control, the OS control will be displayed in undock state at
that location in the workspace where it was saved last.
The drop-down list will always offer the change into all OS controls,
except for the change into itself or to the OS Control Monitor.
Activate project
Activate the selected BATCH project. You obtain all BATCH data
for all other BATCH controls on the same channel from the active
server.
Deactivate project
Deactivate the selected project. The BATCH data of this project is
no longer available to any BATCH control.
Update loaded
Use this function when new data has been generated from BATCH
project
engineering (SIMATIC Manager / BATCH configuration dialog). This
will ensure that the most recent data is displayed in the OS control.
Update project list
Use this function if you want to update the projects currently shown
in the OS control.
Important system
Opens the "Important system messages" dialog. The symbol is
messages
grayed out until an important system message about SIMATIC
BATCH is pending. Only then is the symbol displayed in color and
can be used permanently.
BATCH OS controls
11.3 Operations in process mode
599

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents