Siemens SIMATIC BATCH Operating Manual page 454

Process control system pcs 7
Table of Contents

Advertisement

BATCH Control Center
9.8 Batch control
Step 3
The interrupted recipe unit procedure can now be aborted and reset (commands: "Abort step"
and "Reset step").
Step 4
Right click on the recipe procedure in the control recipe and select "Object properties" from
the context menu. Open the "Allocation" tab in the "Object properties" dialog. Reallocate the
process cell.
Step 5
The new unit is allocated by starting the RUP. The breakpoint at the ROP1 blocks any additional
call.
454
SIMATIC BATCH V8.2
Operating Manual, 02/2016, A5E35958174-AA

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents