Rational engineering
8.2 Single project engineering
8.2.2
Flow chart: Engineering procedure for a single project
Introduction
Below you will see a recommended sequence of configuration steps. The order of the steps
shown in the schematic is not absolutely necessary. We have selected a method on which the
following more detailed description is oriented.
Requirement
The basic control has been created; in other words, the PLC hardware is configured, the CFC
and SFC charts have been created and compiled. The information below relates only to the
supplementary ES configuration for creating recipes and batch control with SIMATIC BATCH.
Example of a configuration for single project engineering
222
SIMATIC BATCH V8.2
Operating Manual, 02/2016, A5E35958174-AA