BATCH Control Center
9.6 Batch Planning
Requirement
The batch is in the "Planned" status and the control recipe is not open.
Procedure in BatchCC
1. In the "Orders" folder in BatchCC, select the object "Batch" below the production order.
2. Select the menu command Edit > Properties.
Result: The dialog box "Properties of <batch name>" is displayed. In this dialog, you can
do the following:
– Display and, if required, modify the batch quantity
– Setting the Start mode for batch processing (Page 357)
– Displaying and modifying unit allocation (Page 357)
– Displaying and modifying formula parameters (Page 359)
– Displaying the chaining of the batch and changing if necessary (Page 359)
– Displaying the run time of a batch (Page 362)
3. Make all the settings you require for the batch and confirm with "OK".
Result: After it is enabled, the batch can be processed depending on the selected Start mode
and the unit allocation.
356
SIMATIC BATCH V8.2
Operating Manual, 02/2016, A5E35958174-AA