8.1-30 Integration Volume
6. Use the Courtesy Up command to initialize the integration card. At the @ prompt enter
CU x y
x = slot number; y = unit number
If there are two units, both units would have to be initialized.
Repeat this step for unit 2.
7. Test the system for proper operation.
Once the down LED is OFF, the good LED is ON (green), and the yellow LEDs are ON, the card and
links are working properly.
YELLOW Unit 1, Link 1
YELLOW Unit 2, Link 1
YELLOW Unit 1, Link 1
YELLOW Unit 2, Link 1
After Power Up
YELLOW Unit 1, Link 1
YELLOW Unit 2, Link 1
YELLOW Unit 1, Link 1
YELLOW Unit 2, Link 1
YELLOW Unit 1, Link 1
YELLOW Unit 2, Link 1
YELLOW Unit 1, Link 1
YELLOW Unit 2, Link 1
YELLOW Unit 1, Link 1
YELLOW Unit 2, Link 1
YELLOW Unit 1, Link 1
YELLOW Unit 2, Link 1
Octel 200/300
S.4.1
Table 8.1-2 LED Operation for Power-Up Routine
Power-Up Routine
RED
GREEN
RED
GREEN
Pass Selftest
RED
GREEN
RED
GREEN
First 20 seconds
ON
Indicates that both microprocessors on
OFF
the card are functional.
Flash
Flash
Flash
Flash
Enters Selftest for
Approximately 10 seconds
ON
OFF
OFF
OFF
OFF
OFF
Ready for Download
ON
ON
OFF
OFF
OFF
OFF
Code Download complete
OFF
ON
OFF
OFF
OFF
OFF
PB60019-01