Commissioning

This section shows a step-by-step procedure for starting up exemplarily a WAGO
fieldbus node.
Good example!
This description is just an example and only serves to describe the procedure for
a local start-up of a single fieldbus node with a non-networked computer under
Windows.
Two work steps are required for start-up. The description of these work steps can
be found in the corresponding following sections.
Connecting PC and fieldbus node
Assigning the IP address to the fieldbus node
The IP address must occur in the network only once!
For error-free network communication, note that the assigned IP address must
occur only once in the network!
In the event of an error, the error message "IP address configuration error" (error
code 6 – error argument 7) is indicated by 'I/O' LED at the next power-on.
There are various ways to assign the IP address.
The various options are described in the following sections individually.
Following the commissioning descriptions after which the fieldbus node is ready
for communication, the following topics are described:
Preparing the Flash File System
Synchronizing the real-time clock
Restoring factory settings
After the topics specified above, you can find instructions for programming the
fieldbus controller with WAGO-I/O-PRO and the description of the internal web
pages of the web-based Management System (WBM) for additional settings of
the fieldbus controller.
Commissioning 103