Sign In
Upload
Manuals
Brands
WAGO Manuals
I/O Systems
WINSTA 770
WAGO WINSTA 770 Manuals
Manuals and User Guides for WAGO WINSTA 770. We have
1
WAGO WINSTA 770 manual available for free PDF download: Manual
WAGO WINSTA 770 Manual (48 pages)
Sunblind Box 4 Channel
Brand:
WAGO
| Category:
I/O Systems
| Size: 3.13 MB
Table of Contents
Table of Contents
3
1 Notes about this Documentation
5
Scope of Validity
5
Copyright
5
Symbols
6
Number Notation
8
Font Conventions
8
Table 1: Number Notation
8
Table 2: Font Conventions
8
2 Important Notes
9
Legal Bases
9
Subject to Changes
9
Technical Condition of Specified Devices
9
Safety Advice (Precautions)
10
3 Device Description
12
View
13
Figure 1: View
13
Table 3: Legend for "View" Figure
13
Labeling
14
Figure 2: Marking
14
Figure 3: Example of a Serial Number
14
Connectors
15
Connection Overview
15
Figure 4: Connection Overview
15
230V Supply
16
Motors
16
Figure 5: Connection of 230V Supply
16
Figure 6: Motor Connection
16
Table 4: Connection of 230V Supply
16
Table 5: Motor Connection
16
Local Push-Buttons
17
Bus/Central Connection
17
Figure 7: Local Push Button Connection
17
Table 6: Local Push Button Connection
17
Figure 8: Bus/Central Connection
18
Table 7: Bus/Central Connection
18
Screening
19
Display Elements
20
Operating Elements
20
DIP Switch Module
20
Figure 9: DIP Switch Module
20
Table 8: DIP Switch Module
20
IDC Connectors for Jumper
21
Figure 10: IDC Connector for Jumper Bridge
21
Technical Data
22
General
22
Climatic Environmental Conditions
22
Supply
22
Table 9: Technical Data :General
22
Table 10: Technical Data: Environmental Conditions
22
Table 11: Technical Data: Supply
22
Inputs
23
Outputs
23
Table 12: Technical Data: Inputs
23
Table 13: Technical Data: Outputs
23
Control
24
Setting and Operating Units
24
Table 14: Technical Data: Control
24
Table 15: Technical Data: Setting and Operating Units
24
Approvals
25
Standards and Guidelines
25
4 Function Description
26
Networking Several WINSTA ® Sunblind Boxes
26
Bus Operation
26
Central Operation
26
Operating Functions
27
Sunblind Function
27
Slat Function
27
Central Function
27
5 Mounting
28
6 Connect Devices
28
Connection Examples
29
Central Connection with 24V Signals (Central Operation)
29
Central Operation Without Line Break Monitoring
29
Figure 11: Wiring of the Winsta Sunblind Boxes for Conventional 24 V Control
29
Central Operation with Line Break Monitoring
30
Figure 12: Wiring of the Winsta Sunblind Boxes with Monitoring
30
Bus Connection (Bus Operation)
31
Figure 13: Wiring of the Winsta Sunblind Boxes in a Bus System
31
7 Commissioning
32
General Notes
32
Opening the Housing
32
Setting Bus or Central Operation
33
Bus Operation
33
Figure 14: IDC Connector for Jumper Bridge
33
Figure 15: Jumper Setting for Bus Operation
33
Central Operation
34
Figure 16: Jumper Setting for Central Operation
34
Setting Bus Address and Operating Mode
35
Setting of the DIP Switches
35
Figure 17: DIP Switch Module
35
Figure 18: Setting of the DIP Switches
35
Table 16: Setting of the DIP Switches
35
Setting Bus Address
36
Figure 19: Setting of the Bus Address
36
Grouping
37
A Group: Moving Motors 1 to 4 Simultaneously
37
Simultaneously
37
Moves Individually
37
Figure 20: One Group, Motors 1 to 4 Move Simultaneously
37
Figure 21: Two Groups: Motors 1 and 2 and Motors 3 and 4 Move Simultaneously
37
Figure 22: Two Groups: Motors 1, 2, and 3 Move Simultaneously, Motor 4 Moves Individually
37
Table 17: One Group, Motors 1 to 4 Move Simultaneously
37
Table 19: Two Groups: Motors 1, 2, and 3 Move Simultaneously, Motor 4 Moves
37
Move Simultaneously
38
Four Groups: All Motors Move Individually
38
Figure 23: Three Groups: Motors 1 and 2 Move Individually, Motors 3 and 4 Move Simultaneously
38
Figure 24: Four Groups: All Motors Move Individually
38
Table 20: Three Groups: Motors 1 and 2 Move Individually, Motors 3 and 4 Move
38
Table 21: Four Groups: All Motors Move Individually
38
Setting of Bus Failure Monitoring / Line Break Monitoring
39
Standard Mode
39
Operation with Bus Failure Monitoring / Line Break Monitoring
39
Figure 25: Standard Mode
39
Figure 26: Operation with Bus Failure Monitoring / Line Break Monitoring
39
Setting the Operating Time
40
Operating Time 1 Minute
40
Operating Time 4 Minutes
40
Figure 27: Operating Time 30 Seconds
40
Figure 28: Operating Time 2 Minutes
40
Setting the Operating Function (Sunblind/Slat Function)
41
Sunblind Function
41
Slat Function
41
Figure 29: Sunblind Function
41
Figure 30: Slat Function
41
Initialization
42
8 Diagnostics
43
9 Accessories
44
Table 22: Accessories
44
List of Figures
45
List of Tables
46
Advertisement
Advertisement
Related Products
WAGO 750-650
WAGO 750-341
WAGO 750-428
WAGO 750-461/020-000
WAGO 750-377
WAGO 750-498
WAGO 750-462/000-061
WAGO 750-1417/040-000
WAGO LONWORKS 750-319
WAGO 750-1422
WAGO Categories
I/O Systems
Control Unit
Power Supply
Switch
Controller
More WAGO Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL