Commissioning - WAGO -I/O-SYSTEM 750 XTR Manual

Fc ethernet g3 xtr fieldbus coupler ethernet; 3rd generation; extreme
Hide thumbs Also See for WAGO-I/O-SYSTEM 750 XTR:
Table of Contents

Advertisement

WAGO-I/O-SYSTEM 750 XTR
750-352/040-000 FC ETHERNET G3 XTR
Pos : 66 /All e Seri en (Allgemei ne Module)/Ü berschriften/Ebene 1/In Betri eb nehmen - Ü bersc hrift 1 @ 4\mod_1240901452750_21.doc x @ 31570 @ 1 @ 1
8

Commissioning

Pos : 67.1 /Serie 750 (WAGO-I/O-SYST EM)/In Betrieb nehmen/Fel dbus knoten i n Betrieb nehmen/In Betrieb nehmen Ei nlei tung - Anfang (Koppler/C ontroll er) @ 4\mod_1238483034921_21.doc x @ 29371 @ @ 1
This section shows a step-by-step procedure for starting up exemplarily a WAGO
fieldbus node.
Pos : 67.2 /Serie 750 (WAGO-I/O-SYST EM)/In Betrieb nehmen/Fel dbus knoten i n Betrieb nehmen/Einl eitung - Hi nweis: Exempl arisches Beispi el, 2 erfor derliche Ar bei tssc hritte (Koppl er/Contr oller) @ 7\mod_1275300634223_21.doc x @ 57223 @ @ 1
Good example!
This description is just an example and only serves to describe the procedure for
a local start-up of a single fieldbus node with a non-networked computer under
Windows.
Two work steps are required for start-up. The description of these work steps can
be found in the corresponding following sections.
Connecting PC and fieldbus node
Assigning the IP address to the fieldbus node
Pos : 67.3 /Serie 750 (WAGO-I/O-SYST EM)/In Betrieb nehmen/Fel dbus knoten i n Betrieb nehmen/Hi nweis: IP-Adresse mus s eindeutig s ein! @ 4\mod_1243596850245_21.doc x @ 34594 @ @ 1
The IP address must occur in the network only once!
For error-free network communication, note that the assigned IP address must
occur only once in the network!
In the event of an error, the error message "IP address configuration error" (error
code 6 – error argument 7) is indicated by 'I/O' LED at the next power-on.
Pos : 67.4 /Serie 750 (WAGO-I/O-SYST EM)/In Betrieb nehmen/Fel dbus knoten i n Betrieb nehmen/Es gi bt versc hiedene M öglichkeiten, di e IP-Adresse zu vergeben. Di ese wer den i n den nachfolg enden K. @ 9\mod_1281682989099_21.doc x @ 63563 @ @ 1
There are various ways to assign the IP address.
The various options are described in the following sections individually.
Pos : null /Serie 750 (WAGO-I/O-SYST EM)/In Betrieb nehmen/F eldbus knoten i n Betri eb nehmen/Einl eitung - Anfang - i m Ans chl uss sind z us ätzlic he Themen besc hrieben: Flas h, U hr, Defaul @ 4\mod_1243521630641_21.doc x @ 34197 @ @ 1
Following the commissioning descriptions after which the fieldbus node is ready
for communication, the following topics are described:
Preparing the Flash File System
Synchronizing the real-time clock
Restoring factory settings
Pos : 67.6 /Dokumentation allgemei n/Glieder ungs elemente/---Seitenwechs el--- @ 3\mod_1221108045078_0.doc x @ 21810 @ @ 1
Commissioning
85
Manual
Version 1.3.0

Advertisement

Table of Contents
loading

This manual is also suitable for:

750-352/040-000

Table of Contents