Inserting The Fieldbus Coupler/Controller; Removing The Fieldbus Coupler/Controller; Figure 31: Release Tab Of Extended Eco Fieldbus Coupler (Example) - WAGO -I/O-SYSTEM 750 Manual

Hide thumbs Also See for WAGO-I/O-SYSTEM 750:
Table of Contents

Advertisement

72
Mounting
5.6.1

Inserting the Fieldbus Coupler/Controller

1.
When replacing the fieldbus coupler/controller for an already available
fieldbus coupler/controller, position the new fieldbus coupler/controller so
that the tongue and groove joints to the subsequent I/O module are
engaged.
2.
Snap the fieldbus coupler/controller onto the carrier rail.
3.
Use a screwdriver blade to turn the locking disc until the nose of the locking
disc engages behind the carrier rail (see the following figure). This prevents
the fieldbus coupler/controller from canting on the carrier rail.
With the fieldbus coupler/controller snapped in place, the electrical connections
for the data contacts and power contacts (if any) to the possible subsequent I/O
module are established.

Figure 31: Release Tab of Extended ECO Fieldbus Coupler (Example)

5.6.2

Removing the Fieldbus Coupler/Controller

1.
Use a screwdriver blade to turn the locking disc until the nose of the locking
disc no longer engages behind the carrier rail.
2.
Remove the fieldbus coupler/controller from the assembly by pulling the
release tab.
Electrical connections for data or power contacts to adjacent I/O modules are
disconnected when removing the fieldbus coupler/controller.
Manual
1.5.0
750-882 Media Redundancy ETHERNET Controller
WAGO-I/O-SYSTEM 750

Advertisement

Table of Contents
loading

This manual is also suitable for:

750-882

Table of Contents