8.2.2 Flow Path
The picture illustrates the liquid flow path through the pump.
No.
Description
SRD-3x00 Solvent Rack
1
Solvent supply lines from SRD degasser to proportioning valve
(pack of 3 solvent supply lines)
2
3-channel proportioning valve
3
Tubing from proportioning valve to pump head
4
Pump head with working cylinder and equilibration cylinder
(entire assembly)
5
Capillary from working cylinder to equilibration cylinder
(U-tube)
6
Capillary from pump head to purge unit
7
Purge unit with purge valve and system pressure transducer
8
Capillary from purge unit to inline filter
9
Inline filter
Operating Instructions
Fig. 92: Flow path through the loading pump
UltiMate 3000 Series:
NCS-3500RS and NCP-3200RS
Part No.
→ page 20
6030.2547
----
6040.3023
6041.1902
Included in 6041.3001
Included in 6041.3001
----
Included in 6041.3001
6042.5014
Page 227