Installation Requirements; Clearances; ‐1 Installation Clearances - Nordson ProBlue P4 Customer Product Manual

Adhesive melters
Table of Contents

Advertisement

3-4
Installation

Installation Requirements

Clearances

Figure 3‐1
Minimum installation clearances (Top and side views shown)
Item
The distance from the outside edge of a
to the front face of the melter when a short 90‐degree hose
A
fitting is used to connect the hose to the melter
The clearance required to open the pump enclosure door
B
The distance from the melter sub‐base to the front edge of the
tank lid when the lid is at its highest point.
C
The clearance required on the left side of the melter to open the
electrical enclosure door or remove a hose/gun module.
D
Part 1024496_06
Before installing the melter, ensure that the desired installation location
provides the required clearances, environmental conditions, and utilities.
Figure 3‐1 illustrates the minimum clearances that are required between the
melter and surrounding objects. Table 3‐1 describes each clearance.
NOTE: 400/480 volt melter clearances are provided in Appendix E.
A
B
Table 3‐1 Installation Clearances
Description
5
D
/
‐inch Nordson hose
P4 = 370 mm (14.5 in.)
16
P7 = 370 mm (14.5 in.)
P10 = 391 mm (15.4 in.)
P4 = 243 mm (9.6 in.)
P7 = 243 mm (9.6 in.)
P10 = 268 mm (10.55 in.)
P4 = 502 mm (20.0 in.)
P7 = 564 mm (22.2 in.)
P10 = 656 mm (26.0 in.)
P4 = 648 mm (25.5 in.)
P7 = 711 mm (28.0 in.)
P10 = 714 mm (28.1 in.)
C
Required Clearance
E 2014 Nordson Corporation

Advertisement

Table of Contents
loading

This manual is also suitable for:

Problue p10Problue p7

Table of Contents