YASKAWA SGMJV User Manual page 146

Rotational motor mechatrolink-ii communications reference
Hide thumbs Also See for SGMJV:
Table of Contents

Advertisement

4 Operation
4.9.1 Hard Wire Base Block (HWBB) Function
(3) Resetting the HWBB State
Usually after the servo OFF command (SV_OFF: 32H) is received and the servomotor power is OFF, the
SERVOPACK will then enter a hard wire baseblock (HWBB) state with the /HWBB1 and /HWBB2 signals
turned OFF. By then turning the /HWBB1 and /HWBB2 signals ON in this state, the SERVOPACK will enter
a baseblock (BB) state and can accept the servo ON command (SV_ON: 31H).
M-II
Command
Status field
SVON
IO monitor field
HBB
SERVOPACK
state
If the /HWBB1 and /HWBB2 signals are OFF and the servo ON command is received, the HWBB state will
be maintained after the /HWBB1 and /HWBB2 signals are turned ON.
Send the servo OFF command, and the SERVOPACK is placed in a BB state. Then send the servo ON com-
mand again.
IO monitor field
HBB
SERVOPACK state
Note: Even if the servomotor power is turned OFF by turning OFF the main circuit power, the HWBB status is retained
until a servo OFF command is received.
4-60
OFF
(Motor current
/HWBB1
/HWBB2
shut-off request)
SMON
Command, etc.
0
1
HWBB state
OFF
(Motor current
/HWBB1
shut-off request)
/HWBB2
M-II
SV_ON
Command
Command
Status field
0
SVON
1
HWBB state
ON
(Normal operation)
SV_ON
Command
0
0
BB state
Operation
ON
(Normal operation)
SV_OFF
SV_ON
Command
Command
0
1
0
0
BB state
Operation
1
0

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

SgmavSgmcsSgmpsSgmgvSgmsv

Table of Contents