Preparing The Site For The Srx5400 Services Gateway Installation; Site Preparation Checklist For The Srx5400 Services Gateway - Juniper SRX5400 Hardware Manual

Services gateway
Hide thumbs Also See for SRX5400:
Table of Contents

Advertisement

CHAPTER 4
Preparing the Site for the SRX5400
Services Gateway Installation

Site Preparation Checklist for the SRX5400 Services Gateway

Table 16: Site Preparation Checklist
Item or Task
Verify that environmental factors such as
temperature and humidity do not exceed
services gateway tolerances.
Select the type of rack or cabinet.
Plan rack or cabinet location, including
required space clearances.
Plan electrical power provisions.
If a rack is used, secure rack to floor and
building structure.
Acquire cables and connectors.
Locate sites for connection of system
grounding.
Copyright © 2014, Juniper Networks, Inc.
Site Preparation Checklist for the SRX5400 Services Gateway on page 35
SRX5400 Services Gateway Rack Requirements on page 36
SRX5400 Services Gateway Cabinet Requirements on page 40
The checklist in
Table 16 on page 35
preparing a site for services gateway installation.
For More Information ...
"SRX5400 Services Gateway Environmental
Specifications" on page 187
"SRX5400 Services Gateway Cabinet Size and
Clearance Requirements" on page
"SRX5400 Services Gateway Rack Size and Strength
Requirements" on page 37
"Clearance Requirements for SRX5400 Services
Gateway Airflow and Hardware Maintenance" on
page 39
"Calculating Power Requirements for the SRX5400
Services Gateway" on page 189
"Connection to Building Structure for the SRX5400
Services Gateway Rack" on page 39
"DC Power Electrical Safety Guidelines and Warnings"
on page 177
summarizes the tasks you need to perform when
40,
Performed
By
Date
35

Advertisement

Table of Contents
loading

Table of Contents