Planning And Preparing The Site; Site Preparation Checklist For The Srx5800 Services Gateway; Table 24: Site Preparation Checklist - Juniper SRX5800 Hardware Manual

Services gateway
Hide thumbs Also See for SRX5800:
Table of Contents

Advertisement

CHAPTER 7

Planning and Preparing the Site

Site Preparation Checklist for the SRX5800 Services Gateway

Table 24: Site Preparation Checklist

Item or Task
Verify that environmental factors such as
temperature and humidity do not exceed
services gateway tolerances.
Plan rack or cabinet location, including
required space clearances.
Select the type of rack or cabinet.
If a rack is used, secure rack to floor and
building structure.
Acquire cables and connectors.
Locate sites for connection of system
grounding.
Measure distance between external power
sources and services gateway installation site.
Copyright © 2015, Juniper Networks, Inc.
Site Preparation Checklist for the SRX5800 Services Gateway on page 103
SRX5800 Services Gateway Physical Specifications on page 104
SRX5800 Services Gateway Environmental Specifications on page 106
Calculating Power Requirements for the SRX5800 Services Gateway on page 107
The checklist in
Table 24 on page 103
preparing a site for services gateway installation.
For More Information ...
"SRX5800 Services Gateway Environmental
Specifications" on page 106
"Clearance Requirements for SRX5800 Services
Gateway Airflow and Hardware Maintenance" on
page 123
"SRX5800 Services Gateway Cabinet Size and
Clearance Requirements" on page
"SRX5800 Services Gateway Rack Size and Strength
Requirements" on page 121
"Connection to Building Structure for the SRX5800
Services Gateway Rack" on page 122
"DC Power Electrical Safety Guidelines and Warnings"
on page 432
summarizes the tasks you need to perform when
125,
Performed
By
Date
103

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents