TRANSMISSION/SHIFT LINKAGE
Reinstall the following parts:
• Starter motor
•
Pulse generator drive shaft
• Output shaft
• Clutch outer
•
Front engine cover
•
Thermostat housing
•
Right and left cylinder heads/timing belts.
10-26
~HONDA
~
GL12000' GL1200A '--'