Stratasys K6 Series User Manual page 205

3d production system
Table of Contents

Advertisement

6.
The printer will begin the process of building a calibration part. Since both options were selected
in
step
3, this process includes performing a Z tip-to-tip calibration and then building the
calibration part. The status of each task is indicated on the screen. A green checkmark will be
displayed once a task is completed and the page's header will update to reflect the task currently
in process. The tasks displayed will vary depending on which calibration options are selected/
deselected within the Tip to Tip Calibration page
A two-part radial progress graphic is displayed within the center of the page. This graphic
displays the amount of time remaining until the entire process is complete (9 minutes in this
case). Completion percentage is represented by radially filling in the outer progress ring of this
graphic, in a clockwise direction. As each task is completed, the progress graphic will be
updated.
Figure 6-6:
Z Tip-to-Tip Calibration Page
Tasks to
complete
(Figure
6-3).
196
Name of
task in
process

Advertisement

Table of Contents
loading

This manual is also suitable for:

K7 seriesFortus 380mcFortus 380mc carbon fiberFortus k6 seriesFortus k7 seriesFortus 380mc carbon fiber edition

Table of Contents