4.
Perform the necessary steps to prepare for tip calibration and then press the Next button to
proceed with the wizard.
A.
Install a build sheet - make sure the build sheet is as centered as possible when placed onto
the platen.
B.
Verify vacuum - within about 5 minutes the printer should attain sufficient vacuum to secure
the build sheet to the platen. The red X over the top of the Vacuum Status Indicator will
disappear once sufficient vacuum is achieved (see
Figure 6-4:
Prepare for Calibration Page
"Information Bar" on page
194
47).