Download Print this page

Delta AH500 Hardware Operation Manual page 454

Hide thumbs Also See for AH500:

Advertisement

(1) Select a port of a node in the Master Device drop-down list box. Only the ports which can be designated
as master stations are listed.
(2) After users click
a PLC Link through the master station. If the users click No, they will be led to the second step. If the users
click Yes, the setting related to a PLC Link in the PLC which is a part of the node will be uploaded through
the master station, and the data uploaded will be displayed on the screen after the users are led to the third
step. Before the users upload the data, they have to make sure of the following points.
(a) The users have to make sure that the computer and the port designated as a master station are
connected by means of a communication cable.
(b) The users have to make sure that a driver has been created correctly, and the driver is NOT in the
state of Error.
(c) The users have to make sure that they have completed the communication setting in NWCONFIG.
, the system will ask the users whether they want to upload the setting related to
C h a p t e r 11 C o n v e n i e n t F u n c t i o n s
11 - 5

Advertisement

loading