Download Print this page

Testing Routing - Delta AH500 Hardware Operation Manual

Hide thumbs Also See for AH500:

Advertisement

9.2.8

Testing Routing

After the routing tables produced are downloaded, users can test routing by means of a function provided by
NWCONFIG. The steps of testing routing are as follows.
(1) The users have to make sure that all the nodes are wired according to the configuration in NWCONFIG,
and operate normally. The setting of the devices has to be consistent with the setting in NWOCNIFG. In the
Select a Driver window, the users have to select the Routing Mode checkbox, and select a device in the
First Station drop-down list box. Please refer to section 9.1.3 for more information about setting
communication.
(2) After the users select the destination device toward which packets are relayed, they have to click
the toolbar, or Routing Detect on the PLC menu.
The users can also right-click the destination device, and then click Routing Detect on the context menu.
C h a p t e r 9 N e t w o r k C o n f i g u r a t i o n
on
9 - 3 5

Advertisement

loading