A H 5 0 0 H a r d w a r e a n d O p e r a t i o n M a n u a l
(4) Complete a network configuration in NWCONFIG.
(5) Create a mechanism for data exchange performed by means of a PLC Link or an Ether Link. A PLC Link
and an Ether Link operate independently. The users can create them in any order. The addresses
involved in data exchange can not overlap, otherwise an error will occur after the data exchange is
performed. It is recommended that the users should set addresses which are involved in data exchange
according to the programs in the projects created.
The figure below is a table related to data exchange performed by means of a PLC Link. After the users
complete the setting in the table, the master station in NWCONFIG will be marked.
9 - 1 0