Install a Switch Chassis
1.
If you have not already done so, remove the faulty switch chassis.
See
"Remove a Switch Chassis" on page
2.
Determine your next step:
If you have another person to assist you, go to
■
If you are alone, go to
■
Place the chassis on a mechanical lift.
3.
4.
Install the chassis into the rack, and secure the chassis with the five screws that
were removed.
5.
At the front of the server, install these components.
Component
SP interconnect
External interconnects
6.
At the rear of the server, install these components.
Component
Power module, which includes the AC input strip and
the front indicator panel
PDECBs
Switch units
SP tray
SPs
Cables
7.
At the front of the server, install the power supplies.
See
"Servicing Power Supplies" on page
277.
Step
3.
Link
"Servicing SP Internal Interconnect
Assemblies" on page 285
"Servicing External Interconnect
Assemblies" on page 305
Link
"Servicing Power Modules" on page 235
"Servicing PDECBs" on page 199
"Servicing Switch Units" on page 189
"Servicing SP Trays" on page 243
"Servicing SPs" on page 117
Ensure that you install the cables in the same slots from
which you removed them.
165.
Install a Switch Chassis
Step
4.
Servicing the Switch Chassis
283