Install a Front Indicator Panel
3.
Position the faceplate over the panel, install the Torx screws, and tighten the
captive screws to secure the faceplate to the panel.
Switch on the appropriate PDU circuit breakers and power on the server.
4.
See
"Returning the Server to Operation" on page
5.
Verify that the fault has been cleared and the replaced component is operational.
See
"Verify That a Fault Has Been Cleared" on page
6.
Return the replaced component to Oracle.
224
SPARC M8 and SPARC M7 Servers Service Manual • September 2017
73.
54.
Need help?
Do you have a question about the SPARC M8 and is the answer not in the manual?
Questions and answers