Install a Switch Unit
a.
Open the ejector arms so that they are fully open (panel 1).
Install the new switch unit into its slot in the server until the ejector arms
b.
begin to engage (panel 2).
Press the arms back toward the switch unit, and then press the arms firmly
c.
against the switch unit to fully seat it back into the server (panel 3).
The lever should click into place when the switch unit is fully seated in the server.
2.
Reinstall the fan modules that you removed from the faulted switch unit.
See
"Install a Fan Module (Switch Chassis)" on page
Check the event logs to determine whether an FPGA update is required and
3.
update the firmware, if needed.
-> show /SP/logs/event/list/
Event ID
1278
/SYS/SWU0/FPGA update required.
If an FPGA update is required, refer to the
for information about performing the update.
Restart the server, if needed.
4.
-> start /System
Verify that the fault has been cleared and the replaced component is operational.
5.
See
"Verify That a Fault Has Been Cleared" on page
Return the replaced component to Oracle.
6.
See
"Prepare a Component for Return to Oracle" on page
Related Information
"Remove a Switch Unit" on page 194
"Remove a Fan Module (Switch Chassis)" on page 184
"Switch Chassis Cooling Zones" on page 31
198
SPARC M8 and SPARC M7 Servers Service Manual • September 2017
Date/Time
Tue Dec 15 16:25:27 2015 Chassis Log
186.
Class
Type Severity
major
SPARC M8 and SPARC M7 Servers Product Notes
54.
64.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sparc m7

Table of Contents