You must return interconnect assemblies to their original slots in the server.
Note -
See
"Servicing Internal Interconnect Assemblies" on page
Interconnect Assemblies" on page 305
Interconnect Assemblies" on page
Reinstall the removed fan modules.
7.
If the cable you are replacing is in the CMIOU chassis, reinstall the four left fan modules. See
"Servicing Fan Modules (CMIOU Chassis)" on page
Reinstall and reseat the required components from the impacted chassis.
8.
If the cable you are installing is in the CMIOU chassis, reinstall the top four CMIOUs and
reseat the lower four CMIOUs. See
If the cable you are installing is in the switch chassis, reinstall the top three switch units and
reseat the lower three switch units. See
9.
Reseat the SP tray and reinstall the SP in the server.
See
"Servicing SP Trays" on page 243
If the SP is configured to synchronize with a network time server using the Network
Note -
Time Protocol, the Oracle ILOM clock will be reset as soon as the server is powered on and
connected to the network.
See
"Install an SP or SPP" on page
10.
Switch on the appropriate PDU circuit breakers and power on the server.
See
"Returning the Server to Operation" on page
11.
Verify that the fault has been cleared and the replaced component is operational.
See
"Verify That a Fault Has Been Cleared" on page
12.
Return the replaced component to Oracle.
See
"Prepare a Component for Return to Oracle" on page
Related Information
"Remove the Front Indicator Panel Cable" on page 227
297,
(SPARC M7-16), and
285.
179.
"Servicing CMIOUs" on page
"Servicing Switch Units" on page
and
"Servicing SPs" on page
136.
73.
54.
64.
Servicing the Front Indicator Panel Cable
Install the Front Indicator Panel Cable
"Servicing External
"Servicing SP Internal
83.
189.
117.
233